Date Requested: Nov 18 2024 11:08 PM

TGC Unsubscribed Capacity

TSP Name: Trunkline Gas Company, LLC (TSP: 007933062)

Post Date/Time:11/18/2024 11:08PM Eff Gas Day/Time: 11/18/2024 9:00AM End Eff Gas Day: 11/18/2024 Measurement Basis Description: MMBtu

The capacity described below is currently available to fulfill transportation service requests. Capacity which may exist at specific Points of Receipt and Points of Delivery can be determined by reference to the "Unsubscribed by Location" screen.

Transportation capacity may be offered in the future as a result of the expiration of contracts or the failure of Shippers to fully exercise Right of First Refusal and service extension rights. Shippers desiring firm transportation service which would become effective in the future should contact their Marketing Representative for analysis of specific requests. Actual capacity available will depend on the actual receipt and delivery point locations that define the transaction path. The capacity posted represents the firm capacity available as of the first of the month. Any changes in available capacity after the first of the month will be reflected in the posting for future months.

There is Storage Capacity of 0 Bcf. However, capacity availability is dependent upon specific injection and withdrawal requirements. Available Storage Capacity and injection and withdrawal capacity may be limited by actual contractual entitlements. Please contact your Marketing Representative for analysis of specific storage injection and withdrawal level requests.

Downloads:
Displaying: rows out of 6 results
Sequence Number Segment Unsubscribed Capacity
1 ELA TO LONGVILLE 85,000
2 WLA TO LONGVILLE 650,000
4 NTX THROUGH LONGVILLE 0
5 MAINLINE (LONGVILLE TO TUSCOLA) 90,000
6 MAINLINE (NORTH OF TUSCOLA) 525,000
7 MAINLINE SOUTH THROUGH LONGVILLE 0

Comments and Notes:

Capacities are based on the best available information as of date of posting and will be updated as needed. This notice supersedes all prior notices of firm mainline capacity.